A product of Abstrak Technology FZC
Labor & Workforce

Davis-Bacon Rates Wyoming Construction

Wyoming's Davis-Bacon prevailing wage rates directly impact your federal project labor budgets—and miscalculation can derail profitability or trigger compliance penalties. This guide walks you through current rates, compliance requirements, and how modern estimating software keeps your labor costs accurate across every trade and county.

```html

Davis-Bacon prevailing wage rates add 40–60% to baseline labor costs on federally funded projects, and Wyoming presents a unique challenge: county-by-county rate schedules with significant geographic variation, multi-tier trade classifications, and frequent mid-project modifications. If you're estimating a $12 million VA clinic in Cheyenne or a highway project in Teton County, using the wrong rate schedule—or missing a fringe benefit component—can turn a winning bid into a compliance nightmare with back-pay liability and margin erosion.

Wyoming's construction market is small but diverse, spanning heavy civil infrastructure, federal building construction, and military facility upgrades. Davis-Bacon compliance isn't optional: any contract exceeding $2,000 that receives federal funds triggers prevailing wage requirements. The U.S. Department of Labor publishes county-specific wage determinations on SAM.gov, updated regularly with modifications that change rates mid-project. For example, WD # WY20260043 (published January 2, 2026) governs heavy and highway construction projects across multiple Wyoming counties, while WD # WY20250012 has already seen modifications since its original release. Missing these updates or applying the wrong determination costs you in two ways: underbidding leaves money on the table, while overbidding prices you out of competitive federal work.

What Are Davis-Bacon Rates & Why They Matter for Wyoming Contractors

Understanding prevailing wage requirements on federal projects

The Davis-Bacon Act (1931) mandates that laborers and mechanics on federal construction projects receive "prevailing wages"—the hourly rate (including fringe benefits) that corresponds to the wage paid to the majority of workers in a given trade within the project's geographic area. The U.S. Department of Labor's Wage and Hour Division determines these rates by surveying union and open-shop contractors in each county, then publishes wage determinations that specify base hourly rates, fringe benefit amounts, and overtime multipliers for dozens of trade classifications.

In Wyoming, Davis-Bacon applies to projects funded or assisted by federal agencies: VA hospitals, Bureau of Reclamation dams, U.S. Forest Service facilities, tribal housing funded by HUD, airport improvements under FAA grants, and highway projects receiving Federal Highway Administration dollars. The threshold is $2,000 in total contract value. Once triggered, you must pay prevailing wages to all laborers and mechanics employed directly on the site, classify each worker correctly by trade, maintain certified payroll records, and post wage determinations conspicuously at the jobsite.

Non-compliance exposes your firm to withholding of contract payments, back-pay liability for underpaid workers (including fringe shortfalls), civil penalties up to $10,000 per violation, and debarment from future federal contracts for up to three years. The DOL can audit payroll records up to three years after project completion. For a preconstruction team, this means your estimate must capture not only the correct prevailing wage rates but also the administrative cost of compliance: weekly certified payroll submissions, apprenticeship ratios, and fringe benefit reconciliation.

How Davis-Bacon rates differ from standard Wyoming labor costs

Wyoming's average commercial carpenter earns approximately $24–$28 per hour in the open market. Under Davis-Bacon, the same carpenter working on a federal project in Laramie County (Cheyenne) may command $38.50 per hour base wage plus $18.20 in fringe benefits—a total package of $56.70 per hour. That's a 102% premium over market rates. Electricians, ironworkers, and equipment operators show similar spreads. The differential varies by county: Teton County (Jackson) often mirrors union rates from the Intermountain West, while rural counties like Niobrara or Crook may have lower prevailing rates due to thinner survey data.

Fringe benefits are the hidden cost driver. Davis-Bacon wage determinations list a base hourly rate and a separate fringe rate covering health insurance, pension contributions, training funds, and other benefits. You can pay fringes directly (by contributing to a bona fide benefit plan) or as cash-in-lieu added to the worker's hourly check. Either way, the total package must meet or exceed the published rate. Many estimators mistakenly budget only the base wage, then discover the fringe obligation during project setup, creating an instant 20–30% cost overrun on labor.

40–60%
Typical cost premium of Davis-Bacon wages over Wyoming market rates

Another distinction: Davis-Bacon classifications are granular. A single CSI Division 03 concrete scope might require separate wage rates for cement masons, laborers (grade IV for skilled concrete work vs. grade I for cleanup), and truck drivers delivering ready-mix. Misclassifying a cement mason as a common laborer saves you $8 per hour on paper but triggers back-pay liability when the DOL audits certified payroll. Your estimate must map every task in your scope of work to the correct trade code in the applicable wage determination.

Wyoming Davis-Bacon Rate Structure: County Breakdown & Trade Classifications

How to find current prevailing wage rates for your Wyoming county

Davis-Bacon wage determinations are published on SAM.gov (the System for Award Management, which replaced the old WDOL website). Navigate to the Wage Determinations section, select "Construction," then filter by state (Wyoming) and construction type (Building, Heavy, Highway, or Residential). Each determination lists:

For example, WD # WY20260043 (published January 2, 2026) governs heavy and highway construction projects and reflects union rates for the classifications listed. If your project falls in a county covered by this determination, you must use these rates—even if you're an open-shop contractor. The wage determination in effect at bid time generally governs the contract, but the contracting agency may incorporate an "economic price adjustment" clause allowing rate updates during multi-year projects.

Wyoming's 23 counties are grouped into regional wage determinations. Albany, Laramie, and Natrona counties (home to Laramie, Cheyenne, and Casper) typically have the highest rates due to stronger union presence and higher cost of living. Rural counties—Sublette, Crook, Weston—may share a single determination with lower rates but fewer surveyed contractors, leading to wider swings when the DOL updates data. You must confirm the correct county for the project site, not your office location. A contractor based in Cheyenne bidding a project in Sheridan must use Sheridan County rates.

Common trade classifications and wage tiers (laborers, carpenters, electricians, etc.)

Davis-Bacon wage determinations list dozens of trade classifications, each with a unique base wage and fringe rate. Key trades you'll encounter on Wyoming federal projects include:

Laborers deserve special attention because the classification spans five or more skill grades. A common laborer (cleanup, material handling) earns the lowest rate, while a skilled laborer (operating a small compactor or jackhammer) earns 10–15% more. Misclassifying skilled work as common labor is the most frequent Davis-Bacon violation on heavy civil projects. Your estimate should break out labor hours by skill grade, cross-referenced to the applicable line item in the wage determination.

Apprentices are permitted under Davis-Bacon at reduced rates, provided they're registered in a DOL-approved apprenticeship program and the contractor maintains the correct journeyman-to-apprentice ratio (often 1:1 or 2:1). Apprentice wages are expressed as a percentage of the journeyman rate (e.g., first-year apprentice electrician = 50% of journeyman base + full fringe). You can achieve meaningful labor savings by structuring your crew mix to maximize apprentice utilization within compliance limits, but your estimate must account for the administrative overhead of program enrollment and ratio tracking.

Step-by-Step: Estimating Labor Costs Using Current Davis-Bacon Rates

Building a Davis-Bacon labor template in your estimates

Accurate Davis-Bacon estimating begins with a structured labor template that separates base wages, fringe benefits, and burden (payroll taxes, workers' comp, general liability). Here's a practical workflow:

  1. Confirm the applicable wage determination: Visit SAM.gov, identify the WD number for your project's county and construction type, download the PDF, and note the publication date and modification number. Bookmark the permalink and attach the PDF to your estimate folder for audit trail.
  2. Perform your quantity takeoff: Quantify materials and assemblies by CSI division (Division 03 concrete, Division 05 metals, etc.). For each assembly, estimate labor hours by trade. A 1,000 SF elevated slab on metal deck might require 80 hours of ironworker time (deck and rebar), 40 hours of laborer time (concrete placement), and 30 hours of cement mason time (finishing).
  3. Map tasks to trade classifications: Cross-reference your labor breakdown to the wage determination. Ironworker (structural) = $44.00 base + $24.50 fringe = $68.50 total. Laborer (grade III, concrete) = $28.00 base + $14.00 fringe = $42.00 total. Cement mason = $38.00 base + $18.00 fringe = $56.00 total. (These are illustrative; always use the current published rates.)
  4. Calculate straight-time labor cost: Multiply hours by total hourly rate. Ironworkers: 80 hrs × $68.50 = $5,480. Laborers: 40 hrs × $42.00 = $1,680. Cement masons: 30 hrs × $56.00 = $1,680. Subtotal labor = $8,840.
  5. Add payroll burden: Davis-Bacon rates include fringe benefits but not employer-side payroll taxes (FICA, FUTA, SUTA) or workers' compensation insurance. Apply your firm's burden rate (typically 18–25%) to the base wage portion only, not the fringe. For ironworkers: 80 hrs × $44.00 base × 22% burden = $774. Repeat for each trade.
  6. Account for overtime: Davis-Bacon requires time-and-a-half for hours over 40 per week. If your schedule assumes 50-hour weeks, calculate 40 hrs at straight time and 10 hrs at 1.5× the base wage (fringe stays flat). Ironworker OT rate = $44.00 × 1.5 = $66.00 base + $24.50 fringe = $90.50 per hour.
  7. Include training fund contributions: Some wage determinations specify separate training fund contributions (e.g., $0.50 per hour worked). This is in addition to the listed fringe and must be budgeted separately.

Store this breakdown in a spreadsheet or estimating platform with formulas that auto-calculate burden and overtime. Lock the wage determination reference (WD number, date) in your estimate metadata so future audits can verify which rates you used at bid time.

Crossing trade requirements with county-specific rates

Wyoming's county-level rate variation means you cannot reuse a labor template from a Cheyenne project when bidding in Gillette. A structural ironworker in Laramie County (WD # WY20250012, hypothetically) might earn $44.00 base + $24.50 fringe, while the same trade in Campbell County (coal country around Gillette) could be $40.00 base + $20.00 fringe due to different survey data. That $8.50/hour difference scales quickly: 2,000 ironworker hours = $17,000 cost variance.

Best practice: maintain a rate library in your estimating system organized by county and construction type (building vs. heavy/highway). Each time the DOL publishes a modification, update your library and flag all active estimates that reference the old determination. Missing a rate increase mid-project can cost you tens of thousands in unbudgeted labor expense.

Pro Tip: Subscribe to email alerts from SAM.gov for Wyoming wage determination updates. The DOL publishes modifications sporadically—sometimes monthly—and your estimate must reflect the rates in effect on bid day.

Manual spreadsheet tracking introduces lookup errors and version control issues, especially when multiple estimators work on concurrent bids across different counties. Modern estimating platforms integrate prevailing wage databases that auto-refresh with DOL updates and flag discrepancies. For example, AI-powered construction estimating software can cross-reference your project location and construction type to pull the correct wage determination, then populate labor line items with current rates and fringe breakdowns. This reduces manual lookup time by 80% and eliminates the risk of applying outdated or wrong-county rates.

Common Compliance Pitfalls & How to Avoid Them

Misclassifying trades or using outdated rate schedules

The most expensive Davis-Bacon mistake is misclassifying skilled work under a lower-paid trade code. A cement mason finishing a 10,000 SF warehouse slab should be paid the cement mason rate (~$56/hour total). If you classify that work as common laborer (~$34/hour), you save $22/hour on paper—but when the DOL audits certified payroll and sees "laborer" performing finish work, you owe back pay on every hour plus penalties. On a 400-hour slab pour, that's $8,800 in retroactive wages.

Trade classification disputes often arise in gray areas: is a worker installing metal studs a carpenter or an ironworker? Is someone operating a skid-steer a laborer or an operating engineer? The wage determination includes "additional classifications" language and a conformance process for unlisted trades, but estimators should classify conservatively (use the higher rate) to avoid exposure. Document your classification rationale in the estimate notes and consult the DOL's All Agency Memos for guidance on ambiguous trades.

Using outdated rate schedules is nearly as common. Wage determinations change with modifications that update base wages, fringe amounts, or covered counties. If you bid in December 2025 using a determination from March 2025, and the DOL published a modification in August 2025 raising electrician wages by $2/hour, your labor budget is instantly underwater. Always verify the publication date and modification number on SAM.gov before finalizing your estimate. Include the WD number and date in your bid documents so the contracting officer knows which rates you used; if they incorporate a newer determination into the contract, you can request an equitable adjustment for the wage increase.

Forgetting apprenticeship and training fund deductions

Apprenticeship ratios and training fund contributions are footnotes in wage determinations but major cost factors in execution. Many Wyoming determinations allow apprentices at 50–70% of journeyman wages, provided they're enrolled in a DOL-registered program. If you estimate 1,000 electrician hours at the full journeyman rate ($48 base + $24 fringe = $72/hour) but plan to staff half the work with apprentices (averaging 60% of journeyman = $43.20/hour), you save $28,800. However, if you fail to register apprentices or exceed the permitted ratio, the DOL reclassifies all apprentice hours at full journeyman wages, erasing your savings and adding penalties.

Training fund contributions (typically $0.25–$0.75 per hour) are sometimes listed as a separate line in the wage determination. These must be paid to the designated training program in addition to the base wage and fringe. Omitting a $0.50/hour training fund contribution across 20,000 labor hours costs you $10,000. Your estimate template should include a line item for training fund contributions, calculated as hours × rate per the wage determination.

Another pitfall: fringe offset errors. If you provide health insurance and pension benefits through a qualified plan, you can credit the cost of those benefits against the Davis-Bacon fringe requirement. But if your plan costs less than the fringe amount, you must pay the shortfall as cash-in-lieu. Example: wage determination requires $18/hour fringe, your health plan costs $12/hour, you owe $6/hour cash-in-lieu. Many estimators forget to model the cash-in-lieu component, assuming their existing benefit package fully satisfies the fringe obligation. Always calculate the fringe shortfall and budget it as a separate line item.

Automating Davis-Bacon Compliance in Your Estimating Workflow

Using estimating software to embed prevailing wage rates into templates

Spreadsheet-based Davis-Bacon estimating is time-consuming and error-prone. You must manually look up rates, transpose them into your template, apply burden formulas, and update templates whenever the DOL publishes a modification. A typical federal bid might involve 40+ trade classifications across multiple CSI divisions, each requiring separate rate lookup and burden calculations. For a preconstruction team juggling six concurrent bids, this manual process consumes 10–15 hours per estimate and introduces version control issues when multiple estimators share templates.

Modern estimating platforms solve this by integrating prevailing wage databases directly into the software. You tag a project as "Davis-Bacon" and select the county and construction type; the system auto-populates wage rates from the current determination, applies fringe and burden formulas, and flags when the DOL publishes a modification. When you build a labor assembly (e.g., "Form, pour, finish elevated slab on metal deck"), the software prompts you to assign trade codes to each labor component, then calculates the blended crew cost using the embedded Davis-Bacon rates. This reduces rate lookup time by 80% and eliminates the risk of applying outdated or wrong-county rates.

Platforms like Build Intel go further by embedding AI-driven scope analysis throughout the estimating workflow. Instead of manually cross-referencing your scope of work to trade classifications, you can use AI-accelerated tools to identify labor-intensive tasks, suggest correct trade codes, and auto-generate scope narratives that cite prevailing wage requirements. For example, Build Intel's scope generation software drafts detailed scopes of work that include Davis-Bacon compliance language, trade classifications, and fringe benefit obligations—saving 2–3 hours per bid and reducing scope gaps that lead to post-bid disputes.

AI-powered scope analysis to flag labor classifications and compliance gaps

Even with embedded wage rates, estimators face a cognitive load challenge: ensuring every labor task in the scope maps to the correct trade classification, that apprentice ratios are feasible, and that all fringe and training fund components are budgeted. A missed trade code or incorrect skill grade is invisible in a spreadsheet until the DOL audits certified payroll months after project start. AI tools can catch these errors before you submit the bid.

AI-driven estimating assistants analyze your scope of work in plain English, identify labor-intensive activities, cross-reference them to prevailing wage classifications, and flag potential mismatches. For instance, if your CSI Division 03 scope includes "place and finish 12,000 SF concrete slab" but your labor breakdown lists only common laborers (no cement masons), the AI surfaces a compliance risk: finishing work requires a cement mason classification at a higher wage rate. Similarly, if you've budgeted 2,000 electrician hours but your project schedule assumes 50-hour weeks, the AI calculates the overtime premium and warns that your labor budget may be short.

Build Intel's DEXTER AI exemplifies this approach. DEXTER is context-aware and embedded throughout the estimating workflow—not a standalone chatbot. You can ask DEXTER questions like "What Davis-Bacon wage rate applies to ironworkers in Laramie County?" or "Flag any scope items missing labor classifications." DEXTER surfaces bid anomalies during bid leveling, compares subcontractor quotes to your Davis-Bacon labor budget, and drafts scope narratives that cite prevailing wage requirements and training fund obligations. This AI-accelerated, human-driven process reduces manual compliance review by ~30% while improving accuracy—estimators still make final classification decisions, but AI handles the tedious cross-referencing and anomaly detection.

Other solutions include dedicated prevailing wage modules in construction ERP systems (like Sage 300 CRE, CMiC, or Foundation), which track certified payroll and reconcile actual wages to estimated rates. These tools are better suited to project execution than preconstruction, but integrating your estimating platform with your ERP ensures wage rate assumptions flow from estimate to payroll without manual re-entry. Some firms also use third-party compliance services (like LCPtracker or Elation Systems) that monitor DOL updates and generate certified payroll reports, reducing administrative burden but requiring separate data integration.

Best Practices: Managing Davis-Bacon Projects from Estimate to Close

Documenting prevailing wage compliance in your bid submission

Your bid package should explicitly reference the wage determination you used, the publication date, and the modification number. Include a statement like: "Labor costs estimated using Davis-Bacon Wage Determination WY20260043, Modification 0, published January 2, 2026, for Heavy and Highway Construction in [County Name]." Attach a copy of the wage determination PDF to your bid documents. This creates an audit trail proving you used the correct rates at bid time and protects you if the contracting agency later incorporates a different determination into the contract.

If your bid includes subcontractors performing Davis-Bacon work, require each sub to certify in their quote that they've included prevailing wage rates and understand their certified payroll obligations. Pass the applicable wage determination to all subs during the invitation to bid (ITB) process. Automated sub outreach tools

Start estimating smarter — try Build Intel free for 20 days

AI-accelerated takeoffs, bid leveling, sub management, and proposals. Credit card required.

Start Free for 20 Days →
SK
Safeer Ullah Khan

Construction technology consultant and contributor to Build Intel. Safeer focuses on the intersection of construction operations and software, helping GCs and estimating teams adopt modern preconstruction tools without disrupting their workflow.

Last updated: May 2026